WATER UPDATE
Water Quality
�
Water quality during December met or exceeded State and Federal
drinking water standards.
�
The Valley Pumping Plant blend ratio for the month of December
was 53% MWD to 47% BOU.
Financial and Operations Update
�
Potable water sales for December were 729,073 billing units.
This was 1% lower than the budgeted sales. Revenue for December was
$1,235,274.
�
Reclaimed water sales for December were 12,941 billing units.
Revenue for December was $16,905, not including Power Plant sales.
�
The Water Cost Adjustment Charge (WCAC) account had a balance of
$1,324,730 as of December 31, 2003.
�
Fiscal Year 2003-04 Year-To-Date preliminary Water Fund
Financial Results as of December 31, 2003:
�
Fiscal
Year 2003-04 preliminary Water Fund Financial Reserve balances as of December
31, 2003 are summarized in the following table:
Capital Projects
�
Replacement of interior joints at Reservoir No. 2 is complete.
The reservoir has been cleaned, disinfected, and is leak tested. As a result
of the leak testing, additional work by the contractor is required. Localized
problems with the bonding of the lining are being resolved. Additional testing
is planned for early January and the reservoir will be returned to service by
late January 2004.
�
The project to install
1,100 L.F. of 12-inch water main in Buena Vista St. from Alameda Ave. to Olive
Ave. was completed at the end of October. The water service connections to the
new main were completed in December. Abandonment of the old main will take
place in January 2004.
�
Construction of a new
reclaimed water main from the intersection of Mariposa St. and Chestnut St. to
the railroad crossing on Griffith Park Dr. began in November with the
intersection crossing at Victory Blvd. and Griffith Park Drive.
The intersection crossing at
Burbank Blvd. and Griffith Park Dr. will be completed in early January. The
reclaimed main project is scheduled for completion in April/May. This work is
phase II of a project that will bring reclaimed water to the Empire
Center
and connect to the main that goes up Empire Ave. to the Airport entrance near
the A-1 site.
Legislative Update
�
Refer to the attached legislative reports.
ELECTRIC UPDATE
Electric Reliability
�
During December 2003, there
were five outages affecting a total of 3,129 customers. Three of these
outages occurred simultaneously and were 8 minutes long, affecting 1,775
customers. This represents a systemwide average of 0.1965 outages per year,
compared with an industry average of 1.2 outages per year. Since July 1, the
average service availability is 99.9948%, exceeding the City goal of 99.99%.
The average outage length was 68 minutes, compared with an industry average of
80 minutes.
The following table shows the systemwide
reliability statistics through December 2003 for Fiscal Year 2003-04 as compared
to Fiscal Year 2002-03:
Reliability Measure |
Fiscal Year 2002-03 |
Fiscal Year 2003-04, Through Dec. 31 |
Average Outages Per
Year |
0.16634 |
0.1965 |
Average Outage Duration |
91.75 minutes |
68.21 minutes |
Average Service
Availability |
99.9971% |
99.9948% |
Financial and Operations Update
�
MWh sales of 83,302 for December were below the budgeted amount
of 84,631. Year-to-date MWh sales remain above budget due to warmer
temperature during summer months and cooler temperature during winter months.
�
Wholesale gross margins were above budget for the month of
December due to BWP�s ability to utilize its assets to increase sales in the
wholesale market.
�
NEL sales for December 2003, and on a year-to-date basis, were
89,573 and 1,125,752, respectively. On a calendar year basis, 2003 sales were
4% higher then calendar year 2002.
�
Fiscal
Year 2003-04 year-to-date preliminary Power Financial Results as of December
31, 2003:
�
Fiscal Year 2003-04 preliminary Power Fund Financial Reserves as
of December 31, 2003 are
summarized in the following table:
Local Generation Operations Update
Unit Status
�
Olive 1 is in hot-standby and available for service.
�
Olive 2 is in hot-standby and available for service.
�
Olive 3 is unavailable for service as of December 31, 2003. This
unit is decomissioned per SCAQMD permit requirements.
� Olive 4 is unavailable
for service as of December 21, 2003. This unit is decomissioned per
SCAQMD permit requirements.
�
Magnolia 5 is unavailable for service as of December 31, 2003.
This unit is decomissioned per SCAQMD permit requirements.
�
Lake One is available for service.
�
The Microturbine Project has been awarded to SCS. The project is
now in the planning stage. The Microturbines will not be running until the
spring of 2004.
December 2003
Unit Data
Unit |
Availability |
Operating Hours |
MW Net |
NOx, lbs. |
M-5 |
100% |
1.96 |
24.7 |
- |
L-1 |
100% |
155.93 |
6212 |
1133.4 |
O-1 |
100% |
0 |
-172 |
91.7 |
O-2 |
55% |
0 |
-182 |
1045.8 |
O-3 |
0% |
0 |
-34 |
- |
O-4 |
100% |
0 |
-13.1 |
- |
Power Supply
� Sylmar
Converter Station Replacement Project
Engineering and fabrication work associated with this project continues with a
scheduled completion date in late 2004.
�
Restructuring of the Gas Industry in Southern California
BWP staff members attended a public meeting with Commissioner Gregory Brown on
December 12, 2003 regarding implementation of the SoCalGas Comprehensive
Settlement that would restructure the way transportation is handled on the
SoCalGas systems. SoCalGas is currently against implementing the Comprehensive
Settlement. A decision by the California Public Utilities Commission (CPUC) on
whether to drop this restructuring can be expected anytime.
�
BPA
Litigation
In late October 2003 Burbank, Glendale and Pasadena were represented by
Washington D.C. counsel at oral arguments on Bonneville�s Motion to Dismiss
before the DOE Board of Contract Appeals. As of the date of this report,
there has been no decision made. If the Board decides to disapprove
Bonneville�s Motion to Dismiss, the hearing is expected to occur in February
2004.
Magnolia Power Project (MPP)
The items in this report are provided as a general overview of the status of the
Project. These items are discussed in considerable detail among the Project
Participants at the Project Coordination Meetings and at Coordinating Committee
meetings.
Safety
Through December, Kvaerner has worked 63,444 man-hours with
no lost time cases and two recordable cases.
Budget
Refer to the attachment for detailed information on actual expenditures.
Schedule
The project remains on schedule for a commercial operation date of May 25, 2005.
Refer to the attachment for detailed information on Project milestones.
Finance
No Project A refinancing is planned at this time.
CEC Compliance
Excavation monitoring continues pursuant to the Conditions of Certification.
Monthly reports are being made as required by the California Energy Commission (CEC).
No violations of conditions have occurred.
Engineering, Procurement and Construction Activities since last Project
Director�s Report of December 15, 2003
December 19: |
|
December 22: |
Awarded contract for fuel gas heater |
January 5: |
Awarded contract for alloy pipe |
January 14: |
Completed installation of piling for cooling
tower basin |
Transmission
It appears
that LADWP has persuaded the City attorneys in Los Angeles to accept the Letter
Agreement route rather than the route of obtaining approval from the Board of
Water and Power Commissioners. LADWP staff has raised an issue of whether the
Facilities Agreement should reflect the impacts of other LADWP stations besides
Receiving Station E, minor though they are. Staff has taken the position that
the Facilities Agreement should continue to reflect only the impacts on
Receiving Station E.
The management teams of Burbank and Glendale
have reviewed the economic feasibility of scheduled service, and have concluded
that they can offer significant savings to the ISO participants in comparison to
the Open Access Transmission Tariff. The Magnolia ISO participants have been
informed of the deal points and the proposed savings that could be offered.
Physical ties involving Edison continue to be
actively pursued. Staff met informally with Don Allen and reached a preliminary
conclusion that the physical option, while likely to be contested, is legally
feasible.
Staff is continuing to review LADWP�s proposal
for operational arrangements with LADWP that would provide opportunities to
deliver Project output to the ISO under an integrated facilities agreement.
At the December 18 Coordinating Committee meeting, a presentation was made on
the various transmission issues and there was preliminary agreement to take
steps to form a separate study group to pursue physical transmission
alternatives.
Coordinating Committee Action at its Meeting on December 18, 2003
�
Approved Semiannual reports
Project Manager�s (Project Director�s) Actions Since Last Project Director�s
Report of
December 15
With consultation and agreement from Project Participants, the following actions
have been taken:
�
Authorized $36,559 for Kvaerner to provide the required
Construction Mitigation Management assistance services for the project during
October and November of 2003.
�
Authorized $130,050 for Kvaerner to continue to provide
Construction Mitigation Manager services for thirteen months starting December
2003.
�
Authorized $53,411 for Kvaerner to apply custom paint to
structures that are visible beyond the site perimeter in compliance with CEC
and Burbank requirements.
Key Milestones and Anticipated Significant Activities For Next 30 Days
January 16: |
|
January 29: |
|
February 4: |
Complete piping for underground fire protection
system |
February 5: |
Award contract for heavy haul |
February 12: |
Complete engineering on railroad spur |
Coordinating Committee Meeting
The next meeting of the Coordinating
Committee will be on January 15.
Power Supply Capital Projects
�
SCADA/EMS
All
drawings for the Remote Terminal Unit (RTU) upgrades have been issued.
Testing
of the Pacific RTU was completed. Conversion of the map board is nearly
completed and currently displays breaker status for all stations converted to
date. There is one RTU remaining to be installed and tested for the new
Hollywood Way Station. This RTU is being designed and installed by ABB, Inc
and it is expected to be completed during the first quarter of 2004.
To date,
staff has developed screens and configured 20 station annunciators into the
SCADA database. These new displays mimic the annunciator panels at the various
stations and inform dispatchers of the specific reason for an alarm. This
allows the dispatchers to operate more efficiently and avoid making
unnecessary trips to stations.
Change
orders were issued by the Purchasing Department in late December 2003 to allow
delivery and installation of the Emergency Back-Up Server. Finalization of
the advanced application software and network communications with selected
users will be completed.
The
Scheduling and Transaction Management System (STMS) software is being
implemented. The web-based OATI software, and integration with the Telvent
SCADA system, is progressing on schedule and estimated to be completed by
March 2004. The initial training of the new OATI software was held in
December.
�
Telecom
BWP Telecom Engineering provided a proposal to the City of Glendale to
relocate a fiber optic termination cabinet at Disney�s facility at 620 Paula
Street in Glendale.
Engineering
provided a proposal to Warner Turner Technologies Services (Cartoon Network)
for fiber optic service to connect 300 N. Third St. to 204 N. San Fernando
Boulevard.
Engineering
provided a proposal to CCI Digital for fiber optic service to connect 2921 W.
Alameda Avenue to both 2600 and 2625 W. Olive Avenue.
Engineering
released a job order to the Operations Section to install fiber cable and
provide a fiber link for the substation multiplexer between the old and new
Hollywood Way Stations.
Field personnel completed a fiber optic job for Plus 8 Digital to connect 300
S. Flower Street and 111 W. Verdugo Avenue.
Field personnel
completed a fiber optic job for The Switch TV to connect NBC Studios to LADWP
Receiving Station �E� in North Hollywood. (This is a test connection between
LADWP and BWP).
�
BWP Administration Building Remodel
The status of Burbank Water
and Power�s
Administration
Building
remodel remains on hold pending design changes, plan revisions and final
approval.
�
Electrical Distribution
Rerouting of the 34.5 kV Burbank-San Jose
line is complete.
Construction work for extending the ducts
and manholes along Hollywood Way from the Warner Ranch Gate to Oak Street,
along Oak Street to California Street, along California Street from Oak Street
to Alameda Avenue and also along Avon Street from Oak Street to the alley
north of Alameda is complete. Perry C. Thomas, the private contractor for the
Phase-2 underground ductwork, started construction on October 27, 2003 and
completed the installation of all manholes. They are currently working on the
installation of a duct system on Oak Street near Catalina Street towards Buena
Vista and California Street. This work is approximately 30 percent completed.
Since July 1, 2003, a total of ninety-three
pole replacements/installations have been issued to the field, with seventeen
replacements issued in December. Sixty poles have been replaced in this fiscal
year, eleven of which were replaced in December.
Since July 1, 2003, eleven pad mounted
customer stations have been engineered, one of which was engineered in
December. Since July, there have been six pad mounted customer stations issued
to the field and seven pad mounted customer stations have been energized.
Since July 1, 2003, three series circuit
conversions to low voltage have been completed. Three street light improvement
and undergrounding projects have been issued and one has been completed. All
work for the final phase of the Ben Mar Hills Project and the Magnolia
Boulevard Project-Phase 1 is complete. The second phase of the Magnolia
Boulevard Project between Pass Avenue and Buena Vista Street is being
engineered.
Three oil switches were replaced with air
break switches in December.
BWP staff is participating in a Caltrans
meeting to lengthen the Alameda, Hollywood Way and Pass Ave. bridges over
SR-134, and developing cost estimates for Phase 2 of this project. Phase 1,
which includes construction of the new Hollywood Way Substation and a transfer
of load, is 60% complete. Construction of the new off-ramp was completed on
June 30, 2003. BWP staff expects the new Hollywood Way Station to be completed
by April 2004. By June 30, 2004 most of the 34,500 volt system will be
reconfigured to connect four or five lines from Capon Switching Station.
SCPPA awarded a contract to ABB Inc. to
design/build the Gas Insulated Switchgear (GIS) Expansion at the Olive
Switching Station. This will connect the Magnolia Power Plant to the Olive
Switching Station. The preliminary design is in progress and construction is
expected to be completed by November 2004.
Bock Co. is installing a new underground duct
system in the BWP Yard to underground two 69,000 volt overhead lines as a part
of BWP�s overall plan to improve and modernize the BWP generating site.
BWP staff has started work on the Olive Switching Station retrofit by
upgrading circuit breakers, busses and other equipment. This upgrade is needed
because of the Magnolia Power Project.
A total of 775 remote meters have been installed; 444 of which were requested
by Customer Service, and 331 in the course of meter change outs by the line
crew or Test Shop.
�
Customer Service
The Customer Service Division is implementing the Indus Banner billing system
to enhance customer bills. The system is expected to go live in June 2004.
Project Overview
-
78 deliverables, 54 completed, 69%
completed.
-
Indus implementation budget $
2,261,012, expended $ 1,395,596, or 62%.
-
Total project budget, $ 4,678,300,
expended $ 3,155,943, or 67%.
-
Supplemental budget, $ 1,000,000,
expended $0.
-
On target for go-live by June 2004.
System Testing
-
November and December have been
devoted to total cycle system testing. System testing is done on converted
data and used as a very powerful tool for the team to find and fix problems.
Issues and problems arise with the converted data, system set-up, and coding
through the iterative process of system testing. Problems are identified by
severity and are addressed in priority order. Level 1 problems cause the
system to crash. Level 2 problems result from some kind of defect and Level 3
problems are irritants.
-
To date, there are 85 issues from
the system testing, of which 49 issues are now closed. We have not had any
Level 1 problems, only Level 2. The most current issue list is attached for
your information.
Conversion
-
Phase III data, the financial data,
was converted. Testing revealed that some of the rates didn�t come over to the
new system properly. Indus is working on this issue.
-
The full conversion of Legacy data
into Banner has occurred multiple times to support system testing. Each new
conversion incorporates the corrections made to the system as a result of
system testing. A final conversion for system testing will be completed on
December 12.
-
Legacy data clean-up continues. To
ensure the most important items are addressed first, staff prioritized the
clean up work. First priority is on issues related to customer names, followed
by addresses, phone numbers and others. Some items must be corrected in the
Legacy by Customer Service staff, but some will be corrected en masse with
scripts written by Indus staff.
-
Staff continues to work on cleaning
up the City accounts, GL numbers, and Caltrans accounts.
-
An extract from the Legacy system
will be completed on January 5. This will be used as the base for the User
Acceptance Testing (UAT), which is scheduled to begin on
January 7.
Training
-
Navigation training was conducted in November with 32 �testers� who are
representatives from the three primary user departments. These 32 testers will
assist with UAT scheduled in January, February, and March.
-
In December, the testers were
provided with personalized instruction on the key business processes, which
will be tested in the UAT. The UAT process is vital to Customer Service
success. Staff will ask the testers to sign-off on their business processes
and accept them for on-going use before the entire system will be accepted. A
matrix of the testers and the business processes is attached for your
information.
-
The end user training will begin in
February or March. Staff has identified seven different classes, each
containing several modules. Staff has asked other departments to supply names
of people for training. A matrix showing the classes, modules, and business
processes is attached for your information.
Technical Issues
-
Indus began working against the new
addendum, which provides Systems Administration, DBA, Operations, and
Conversion supports. With the exception of Operations, all Indus technical
staff were on-site during this period.
-
A draft of the configuration
management plan was delivered. This plan outlines the process to ensure that
each environment (Train, Test, Development, and Production) has the expected
software, data, and interfaces. This allows changes to any of these items to
be thoroughly tested before being passed into Production.
-
Indus staff, in conjunction with
City IT staff, created a System Test environment.\
-
Upgrades to Indus� software were
installed: BillGen 8.6; Banner CIS 3.1 Service Pack 2.
-
All coding work and testing has
been completed for the six modifications and three interfaces. Completed
modifications include Customer Maintenance Fields; Empire Center Qualifying
Loan Counter; Mass Create Service Order Based on Meter Age; Water Demand;
Electric Demand; and Mass Create Premises and Service. Completed interfaces
include IVR; Cashiering for Windows; and Bill Print Enhancements. Two
interfaces, which have not been completed, are Itron and GL.
-
Indus has begun the process of
documenting all processes. They will provide customized hard copy
documentation as well as on-line documentation in the form of �help buttons�.
-
Staff has been working with Bank of
America, Systems Innovators (cashiering system), Technology Unlimited (payment
processing system), and Indus to ensure that all file formats are updated to
include the new Banner account numbers as well as the old Legacy account
numbers for all of our electronic payments, both direct debit and customer
initiated.
-
To avoid unnecessary purchase of
hardware, a decision was made early in the project to have the System
Innovators (cashiering) application and Banner forms sit on the same server
with the City�s Oracle Financial application. This method has not worked well
because the IT Department wants to limit access to the server for City
personnel only. Problems exist when Indus needed to get into one of the Banner
applications after hours. Hence, the decision was made to temporarily move the
Banner applications to the Banner web server and, ultimately, purchase a
separate server for those applications.
Bill Print
-
Group 1 installed their software
and completed modification and interface testing.
-
Customer Service has successfully
produced sample bills from the test environment; however, we have yet to
produce a bill using converted data which should occur before the next
progress report.
-
Staff is still working on the bill
format for the Time Of Use (TOU) customers.
Project Issues
-
E-Dash is a management tool which
allows flexible compilation and display of data. The Indus trainer for their
e-Dash module was not available as scheduled for two days of on-site training.
In lieu of the on-site training, staff received a complimentary one-hour
overview via the internet. The on-site training will be rescheduled for later
in the project year. The overview didn�t provide sufficient detailed
information to determine its eventual usefulness. If e-Dash is not able to
create system reports, Crystal Reports will be used.
-
As reported before, it is our
contention that Water and Electric Demand was supported by the Banner product
when the product was purchased. Unfortunately, this was not the case and
Indus had to write two modifications to handle the requirement. After a
thorough review of the Indus proposal, the Indus Project Manager is working
with Indus to absorb the cost. As of today, it looks promising for us with an
estimated cost saving of $52,000.
-
BillGen software (complex billing)
has been installed and tested in a BWP environment. However, BillGen system
testing is behind schedule. There are several outstanding functional issues
that must be resolved. Indus committed an additional week of on-site time for
the BillGen programmer to work face to face with BWP staff.
-
Indus experienced severe server
problems that affected the coding team causing a three-day work delay. This
may affect the delivery date of some codes but is unlikely to affect the
system-testing schedule.
-
Staff is working on how to handle
intra-City payments. Payments must actually be input in Banner at some point
or they will not flow to the GL. Staff can continue doing this manually, or
issue bills to other Departments for the payment process along with all of
their other invoices. Master accounts for each department can be set up so
only one check will be cut for each department.
Personnel
-
A CIS IT Project Manager was hired
in December to coordinate IT resources for the project and provide IT project
management capabilities.
-
A new Data Base Administrator (DBA)
was hired, and began working in December. This person will support the CIS
implementation and the Banner product.
Legislative Update
Refer to the
attached legislative reports.