WATER UPDATE
Water Quality
- Water quality during February met or exceeded State and Federal drinking
water standards.
- The Valley Pumping Plant blend ratio for the month of February was 47.84%
MWD to 52.16% BOU.
Financial and Operations Update
- Potable water sales for February were 633,102 units. This was 9.89% higher
than the budgeted sales estimate. Revenue for February was $1,066,965.
- Reclaimed water sales for February were 8,290 billing units. Revenue for
February was $10,408 not including the Power Plant sales.
- Fiscal Year 2002-03 Year-To-Date Water Fund Financial Results as of
February 28, 2003.
$ in 000�s
( ) = unfavorable |
Year-To-Date
Actual |
Year-To-Date
Budget |
Variance |
CCF |
6,479,133 |
6,597,106 |
(117,973) |
Total Revenues |
$ 10,871 |
$ 10,555 |
$ 316 |
Total Operating Expenses |
9,109 |
10,124 |
1,015 |
Operating Income/(Loss) |
$ 1,762 |
$ 431 |
$ 1,331 |
The Water Cost Adjustment Charge (WCAC) account had a balance of $1,221,024
at February 28, 2003.
Environmental Protection Agency (EPA)
- BWP received a grant to perform a Vulnerability Assessment from the EPA. The
Report has been filed with the EPA.
- The design work for the modifications to the Liquid Phase Granulated
Activated Carbon (LPGAC) units has been completed. The EPA provided approval
to fabricate the necessary materials. Approval for construction is pending EPA�s
approval of the final design report.
Capital Projects
- The Water Division completed construction of the 16" main expansion
of the Reclaimed Water System on Chestnut and Mariposa. The project will
provide reclaimed water for the Chandler Bikeway and landscaping scheduled
for construction in the spring of 2003.
- Replacement of interior joints at Reservoir No. 2 by contract services
continues.
- The Water Division continues to support the Magnolia Power Project by
abandoning and relocating water facilities on the proposed construction site
at BWP.
Legislative Update/Other Reports
- Refer to the attached reports from the Los Angeles Daily News, Los Angeles
Times, Metropolitan Water District of Southern California, and California
Municipal Utilities Association (CMUA),.
- MWD is sponsoring a two and one-half day educational trip of the Northern
California State Water Project/Bay-Delta on June 13, 14, and 15, 2003. The
trip will allow participants to view, first-hand, MWD's statewide investments
in an effort to ensure reliable supplies of water for Southern California.
ELECTRIC UPDATE
Electric Reliability
- There were no customer outages in February. During the first eight months
of FY 2002-03, there were 15 outages that affected 6,920 customers, which
equals a systemwide average of 0.1279 outages per year compared with an
industry average of 1.2 outages per year. The average service availability
is 99.997%, exceeding the City goal of 99.990%.
The average outage length was 84 minutes, compared with an
industry average of 80 minutes.
The following table shows the systemwide reliability
statistics for FY 2001-02 compared to the first eight months of FY 2002-03.
Reliability
Measure |
FY
2001-02 |
FY
2002-03,
July
1 to February 28 |
Average
Outages Per Year |
0.2564 |
0.1279 |
Average
Outage Duration |
57.93
minutes |
83.94
minutes |
Average
Service Availability |
99.9943% |
99.9969% |
Financial and Operations Update
- Fiscal Year 2002-03 Power Financial Results (preliminary) as of February
28, 2003.
Amounts
in 000�s
(
) = unfavorable |
Year-To-Date
Actual |
Adopted
Budget |
Variance |
MWh |
718,005 |
752,208 |
(34,203) |
Total
Revenue |
$
135,958 |
$
108,635 |
$
27,323 |
Total
Operating Expenses(a) |
124,591 |
107,333 |
(17,258) |
Operating
Income/(Loss) |
$
11,367 |
$
1,302 |
$
10,065 |
Retail
Revenue |
$
88,382 |
$
95,413 |
$
(7,031) |
Wholesale
Revenue |
46,096 |
11,756 |
34,340 |
Other
Revenue(b) |
1,480 |
1,466 |
14 |
Total
Revenue |
$
135,958 |
$
108,635 |
$
27,323 |
(a)
Includes in-lieu
(b)
Transmission and telecom sales
- MWh sales of 79,468 for February were below the budgeted amount of 83,990.
Temperatures were cooler than average with heating degree days of 266 versus
a 30 year average of 235. Year-to-date MWh sales remain below budget due to
conservation efforts and cooler than average temperatures in the summer.
- Wholesale gross margins were below budget for the month of February.
Winter months generally produce less wholesale sales due to a decrease
demand in energy. Year-to-date wholesale gross margin continues to be higher
due to BWP�s ability to efficiently use utility assets to increase sales
in the wholesale market during the summer months.
Local Generation Operations Update
Unit Status
- Magnolia 5 is unavailable for service because of an air compressor
failure.
- Olive 1 and 2 are unavailable for service until the NOx retrofit is
complete.
- Olive 3 and 4 are available for service.
- Lake One is available for emergency use only.
- The South Coast Air Quality Management District (AQMD) issued authority to
construct the Olive 1 Retrofit. Equipment deliveries started for the Olive
Retrofit Project. The kick-off meeting was held with AUS and all
subcontractors this month. RM Myers Corporation began work on the final lead
abatement for the Olive 1 structure. The Olive boiler inspections and
overhaul of the equipment continues. The AQMD has not yet issued authority
to construct Olive 2. The application is currently under EPA review.
- The Magnolia 5 Combustion Turbine was down due to air compressor damage.
- The Lake One AQMD Source Testing was performed on February 11th.
VOC tests were successfully rerun under an alternative procedure approved by
the AQMD. The AQMD will review and issue a letter authorizing operation by
April, 2003.
February 2003 Unit Data
Unit |
Availability |
Operating
Hours |
MW
Net |
NOx,
lbs. |
M-5 |
0% |
0 |
0 |
- |
L-1 |
0% |
40:21 |
1183 |
218.8 |
O-1 |
0% |
0 |
0 |
0 |
O-2 |
0% |
0 |
0 |
0 |
O-3 |
100% |
4:54 |
-7.1 |
- |
O-4 |
100% |
2:31 |
103.9 |
- |
Power Supply
- Transmission and Regional Transmission Organizations (RTOs)
There is still a lot of uncertainty surrounding the future
of the Federal Energy Regulatory Commissions (FERC�s) Notice of Proposed
Rulemaking (NOPR) which deals with the Standard Market Design (SMD) for RTOs.
Opposition to SMD is strong in many parts of the country. Consequently, it
remains unknown what the final form and schedule for implementation will
ultimately be. Burbank filed comments with FERC regarding potential problems
that could result if SMD is not implemented properly. Consequently, we are
recommending that FERC adopt a go-slow approach and do further studies on the
potential adverse effects. Our input was well received by FERC and other
industry participants. Our work was one of the most complete evaluations of
the SMD issues. It demonstrated technical problems with the approach that must
be fixed in order to avoid serious problems.
- FERC Data Requests and Refund Calculation
The major activity in this area focused on responding to
six data requests from California Parties representing the Attorney General
and various State agencies asking over 130 questions related to our marketing
efforts from January 2000 through June 2001. As well, our Washington FERC
attorneys submitted testimony on our behalf in the case arguing that Burbank
did not engage in market manipulation activities during the period under
investigation.
- Restructuring of Gas Industry in California
Implementation of the Comprehensive Settlement by Southern
California Gas Company (SoCalGas) is still under suspension. The California
Public Utilities Commission (CPUC) decided late in the month that it would
hold a series of hearings regarding the comprehensive settlement
implementation. It is unclear whether the settlement will be approved. BWP
does not support turning over the SGC system to trading as outlined in this
settlement.
Capital Projects
- Metso Supervisory Control and Data Aquisition/Energy Management System (SCADA/EMS)
The RTU installation at Victory Distributing Station has
been completed, as well as the annunciator change out at Naomi Distributing
Station. The new Remote Terminal Units (RTUs) have been installed at the SCADA
Center and the McCambridge, Naomi and Winona Stations and have been released
for testing. Fieldwork for the RTUs at Town Station has begun. The Interchange
Transaction Scheduling (ITS) software now correctly reflects BWP�s energy
scheduling practices, including tag designations as well as the ability to
quickly calculate and display percent line loading, power factor, etc. from
incoming data.
Work continued on the link from SCADA to the Distributed
Control System (DCS) at the Olive Power Plant and Lake One. Work continued on
the system database and several applications, as well as on the specification
for the energy scheduling and trading software.
BWP personnel completed the fieldwork to provide fiber
optic service for Ascent Media (formerly Liberty Livewire) connecting 2901 W.
Alameda Ave. to 2130 N. Hollywood Way.
BWP Telecom Engineering issued a fiber job order to connect
Modern VideoFilm at 4411 W. Olive Ave. in Burbank to their satellite facility
at 1733 Flower Street in Glendale.
BWP Telecom Engineering received consent to proceed and
issued a fiber job order to connect TVN Entertainment at 4111 W. Alameda Ave.
to 2901 W. Alameda Ave.
BWP Telecom Engineering issued a job order to install a new
fiber backbone cable along Buena Vista Street from Riverside Drive to Glenoaks
Boulevard. This project includes a new fiber optic cable for the Public Works
Traffic Division.
BWP Telecom Engineering issued a job order to install fiber
optic facilities to connect CCTV (closed circuit television) cameras at both
Valley Switching Station (two cameras) and LADWP Receiving Station
"E" (one camera) to the fiber backbone. These digital cameras are
equipped with pan, zoom and tilt capabilities and are the first of several to
be installed at electrical substations and water facilities. The system will
utilize BWP's fiber optic backbone through a series of multiplexers for both
camera signal and control back to the CCTV control room located at the BWP
guardhouse on Lake Street.
- BWP Administration Building Remodel
Phase II - Window Replacement
Exterior punch list items were completed which allowed for
the removal of the scaffolding. Interior punch list items were addressed with
the exception of the third floor windows. The window contractor is awaiting
further direction from the window manufacturer and once resolved this project
will be complete.
Phase III - Interior Building Remodel
Phase III of the Building Remodel Project is pending
further review of the final set of construction drawings and specifications.
Engineering has issued the job to re-insulate the
69,000-volt Toluca-Valley No. 1 line and to replace poles as necessary.
Engineering for the Media District underground project has
been completed for extending the ducts and manholes along Hollywood Way from
the Warner Ranch Gate to Oak Street, along Oak Street to California Street,
along California Street from Oak Street to Alameda Avenue, and also along Avon
Street from Oak Street to the alley north of Alameda. J. Fletcher Creamer
& Son, Inc. will start construction at the end of March.
Construction of the new offramp (to allow construction of a
new Hollywood Way Distributing Station) has begun. BWP staff expects that the
new off ramp will be open for traffic in June 2003, and the new Hollywood Way
Station will be completed by April 2004.
Underground ductwork has been completed near Hollywood Way
and San Fernando, allowing an overhead line to be rerouted along a less
visible path.
Engineering for Phase I of the DCSB has been completed;
however, at this time there is only approval to reroute the existing services
and remove the poles.
The line crews are rebuilding pole lines in the Rancho
area, and converting the remaining portion of Feeder N-15 to 12,470 volts.
Victory-Valley No. 2 is energized, and the third
34,500-volt line position at Victory Distributing Station is 50% completed.
Engineering has been completed for replacing oil switches
with SF6 switches at San Jose Distributing Station. The underground work has
been done, and the switches themselves will be installed in March.
Electric service to Howard Business Park (Ontario Street)
from the 34,500-volt system has been completed.
Service to Radio Shack has been rerouted and energized to
clear the old Police site.
Eighteen (18) padmounted customer stations have been
engineered, and eleven (11) have been issued to the field.
Six street light improvement and undergrounding projects
have been issued to the field.
Engineering has been completed for the final phase of the
Ben Mar Hills Project and for the Magnolia Boulevard Project. Bid Schedule
1140 is out to solicit bids for this work.
Work is underway to replace 1,200 residential electric
meters with meters that can be read remotely; 712 meters have been installed
through February 28, 2003.
BWP staff has completed the development of the Energy Risk
Management Policy and Procedures and Credit Risk Policy. The purpose of the
two policies is to establish operational guidelines for BWP to plan, execute,
and control the management of a variety of risks associated with energy
portfolio activities and wholesale energy transactions.
BWP�s primary energy risk management and power supply
objectives are to:
- Secure power supply that is adequate to meet expected retail load with
sufficient reserves to reasonably assure that expected load can be served at
the lowest available cost.
- Minimize the risk of high energy input costs (i.e., natural gas purchases)
for retail load customers through cost pricing protection to provide low and
stable rates.
- Use wholesale transactions solely for the purpose of maximizing the
utilization of temporary surplus retail assets to minimize the cost of
serving retail ratepayers.
- Minimize BWP�s operational and financial exposure due to counterparty
default by ensuring that the entities with which BWP enters into power
transactions are able to meet their operational and financial commitments.
These objectives were reviewed with the BWP Board as well
as the procedures associated with the Energy Risk Management Policy and Credit
Risk Policy documents on March 6, 2003. BWP staff will be before the City
Council on May 6, 2003.
Legislative Update
- Refer to the attached reports from the California Municipal Utilities
Association (CMUA), the American Public Power Association (APPA), SCPPA�s
Government Affair�s Manager and Morgan Meguire, LLC.
RED:RAC:FCF:JWL:GLS:ph